Immediate implantation in the posterior mandible
Immediate implantation in the posterior mandible

Block_Veras_1.jpg
Initial situation

Block_Veras_2.jpg
CBCT planning

Block_Veras_3.jpg
CBCT planning for region #46

Block_Veras_4.jpg
Situation before extraction of the remaining tooth root

Block_Veras_5.jpg
Situation before tooth extraction

Block_Veras_6.jpg
Identification and marking of the future implant position

Block_Veras_7.jpg
After tooth root extraction

Block_Veras_8.jpg
Preparation of the implant bed

Block_Veras_9.jpg
Preparation of the implant bed

Block_Veras_10.jpg
After implant placement

Block_Veras_11.jpg
Check of the correct implant position

Block_Veras_12.jpg
Bone graft preparation – cerabone® +HyA and autologous bone chips

Block_Veras_13.jpg
Hydrated cerabone® +HyA

Block_Veras_14
After augmentation of gaps surrounding the implant

Block_Veras_15.jpg
Covering with Jason® membrane

Block_Veras_16.jpg
Wound closure

Block_Veras_17.jpg
Radiographic control

Block_Veras_18.jpg
Radiographic control

Block_Veras_19.jpg
Control 4 weeks post-operative

Block_Veras_20.jpg
Control 4 weeks post-operative

Block_Veras_21.jpg
Implant uncovering 8 weeks post-operative

Block_Veras_22.jpg
Implant uncovering 8 weeks post-operative

Block_Veras_23.jpg
Insertion of healing abutment

Block_Veras_24.jpg
Control after implant uncovering

Block_Veras_25.jpg
Radiographic control